Additional Solutions & Expansion
Design‑Led Budgeting & Execution
UniFi Design Center became the project’s common language across leadership, builders, and vendors. Brandon and Tyler uploaded blueprints, placed cameras/APs, mapped the network room, and specified rack units, power, and data runs. Exports went straight to the cabling company, who executed without additional design effort.
Outcome: Faster board approvals, fewer miscommunications, and significant cost savings by combining at‑cost cabling with volunteer device installs.
AV + Network Room Modernization
The church is consolidating networking and AV into a purpose‑built room with a 42U rack (replacing a 12U closet). UniFi Access readers on production‑area doors will secure equipment while keeping workflows efficient.
Display & Signage Quality‑of‑Life
Two Display Cast units replaced manual, ladder‑based USB updates to TVs. Content changes now happen from the desk — safer, faster, and more flexible for ministry events.
Future Enhancements
- Wi‑Fi parity: Upgrade the church to XGS‑class APs.
- Camera refresh: Move from G4 to G6 at the church to enable enhanced AI features campus‑wide.
- Access expansion: Add readers to interior/back‑of‑house spaces as rooms are renovated.
- Pre‑wired voice: The preschool is pre‑cabled for UniFi Talk in each classroom; although the tenant uses iPads today, Talk can be enabled later without new runs.
- SD‑WAN ready: If inter‑campus apps require private connectivity across Mercy Road locations, Site Magic offers a simple, license‑free SD‑WAN path.